Water Supply – Naracoorte Water Supply Upgrade

This project included the design and construct of water supply network infrastructure that supplies 100% disinfected water to customers in the Naracoorte area, as part of SA Water’s Country Water Quality Improvement Program (CWQIP). SA Water undertook the concept design, and then Fulton Hogan completed a detail design before carrying out the water supply upgrade system, construction of transfer main, disinfection upgrade works at the storage tank, and Bore 9 decommissioning works. Fulton Hogan’s scope included:

  • Trenching and installation of pipework
  • Pipeline boring
  • Link-ins to main Naracoorte tank
  • Hydrostatic testing
  • Flushing and disinfection of transfer main
  • Town bore connections, and bore decommissioning
  • Replacement of the old chlorine dosing system
  • Construction, installation, and connection of new chlorine huts
  • SCADA and controls
  • Switchboard manufacture and installation
  • FAT testing
  • Waste pump
  • Booster pump skid
  • Internal tank pipework
  • New tank hatch and rails
  • Mechanical and electrical works
SHARE
LOCATION Naracoorte, South Australia CLIENT SA Water VALUE AU$2.1m START Oct 2013 END Sep 2014 CAPABILITY Water,  Civil, Pipelines, Excavation, Mechanical & Electrical      

You might also like...

Wetlands/irrigation/floodways  – Riverine Recovery Project (RRP)

Wetlands/irrigation/floodways – Riverine Recovery Project (RRP)

  • SECTOR: Water
  • LOCATION: Adelaide

The Riverine Recovery Project (RRP) forms part of the South Australian Riverland Floodplains Integrated Infrastructure Program (SARFIIP), a Commonwealth funded program to restore the health...

READ MORE
Wetlands/irrigation/floodways  – Katfish Reach Hydrological and Fish Passage Structures

Wetlands/irrigation/floodways – Katfish Reach Hydrological and Fish Passage Structures

  • SECTOR: Water
  • LOCATION: Berri, Riverland

The Katfish Reach Hydrological and Fish Passage Structures project was a significant project, part of a joint Federal and State government initiative designed to improve...

READ MORE
Water Supply  – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

Water Supply – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

  • SECTOR: Water
  • LOCATION: Adelaide

The Hackney Road project section involved 2.2km of pipe relining, underboring, and complete replacement of various sections of pipeline. The pipe alignment ran through the...

READ MORE
Water storage –  Werribee Aquifer Storage and Recovery Project

Water storage – Werribee Aquifer Storage and Recovery Project

  • SECTOR: Water
  • LOCATION: Adelaide

The first of its kind in Victoria, the scheme involved pumping treated water from Werribee Salt Reduction Plant through a series of underground pipe networks...

READ MORE
Water storage  – Olympic Dam Potable 60ML + 80ML Dams Upgrades

Water storage – Olympic Dam Potable 60ML + 80ML Dams Upgrades

  • SECTOR: Water
  • LOCATION: Olympic Dam, SA

Fulton Hogan has undertaken the design, construction and commissioning of all works associated with the 60ML and 80ML dam upgrades including civil, electrical, sump pump,...

READ MORE