Water Supply – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

The Hackney Road project section involved 2.2km of pipe relining, underboring, and complete replacement of various sections of pipeline. The pipe alignment ran through the East Parklands and crossed cultural and state heritage sites, requiring extensive stakeholder management and employing hydro-excavation methodologies to ensure significant tree protection during construction.

The North East Road project section involved over 20 cross connections from a redundant water main to a new main extending 11km from Hope Valley Reservoir to the Gilberton Pump Station along another major arterial road. As a result of the existing network design, some connections were done as a live tap, where a new connection was made onto a live and operating water main.

Additional packages were also added to the project included sewer pipe laying installation works, excavation and contaminated soil disposal, manhole installation, tie in points and grout filling works of redundant sections of sewer main and manholes.

SHARE
LOCATION Adelaide, South Australia CLIENT SA Water VALUE AU$8m START JUL 2015 END Nov 2016 CAPABILITY Water, Civil, Pipelines, Excavation, Cultural and Vegetative Heritage  

You might also like...

Wetlands/irrigation/floodways  – Riverine Recovery Project (RRP)

Wetlands/irrigation/floodways – Riverine Recovery Project (RRP)

  • SECTOR: Water
  • LOCATION: Adelaide

The Riverine Recovery Project (RRP) forms part of the South Australian Riverland Floodplains Integrated Infrastructure Program (SARFIIP), a Commonwealth funded program to restore the health...

READ MORE
Wetlands/irrigation/floodways  – Katfish Reach Hydrological and Fish Passage Structures

Wetlands/irrigation/floodways – Katfish Reach Hydrological and Fish Passage Structures

  • SECTOR: Water
  • LOCATION: Berri, Riverland

The Katfish Reach Hydrological and Fish Passage Structures project was a significant project, part of a joint Federal and State government initiative designed to improve...

READ MORE
Water Supply –  Naracoorte Water Supply Upgrade

Water Supply – Naracoorte Water Supply Upgrade

  • SECTOR: Water
  • LOCATION: Naracoorte

This project included the design and construct of water supply network infrastructure that supplies 100% disinfected water to customers in the Naracoorte area, as part...

READ MORE
Water storage –  Werribee Aquifer Storage and Recovery Project

Water storage – Werribee Aquifer Storage and Recovery Project

  • SECTOR: Water
  • LOCATION: Adelaide

The first of its kind in Victoria, the scheme involved pumping treated water from Werribee Salt Reduction Plant through a series of underground pipe networks...

READ MORE
Water storage  – Olympic Dam Potable 60ML + 80ML Dams Upgrades

Water storage – Olympic Dam Potable 60ML + 80ML Dams Upgrades

  • SECTOR: Water
  • LOCATION: Olympic Dam, SA

Fulton Hogan has undertaken the design, construction and commissioning of all works associated with the 60ML and 80ML dam upgrades including civil, electrical, sump pump,...

READ MORE