PIPELINES – Peninsula Eco Transfer Main

Along the Mornington Peninsula between Rye and Portsea, more than 16,000 properties were reliant on septic tanks and onsite treatment plants to manage household sewage. Due to ageing, failing and poorly maintained septic tanks there was evidence of waste polluting groundwater, waterways and the environment in the region.

To address this, Fulton Hogan (as part of the FHDB JV) were engaged for the design and construction of the Peninsula Early Connection Offer Transfer System, to build infrastructure to transfer sewage from Rye, Blairgowrie, Sorrento and Portsea (and other places) to Boneo Sewerage Treatment Plant and connect more than 16,000 properties to a new pressure sewerage network. The project included:

  • Network / system functionality and design incorporation
  • New transfer main and odour management systems
  • Pressure sewer reticulation direct injection points
  • New wet-well lift pump station
  • Upgrade to existing pump stations
  • Electrical and process works
SHARE

LOCATION
Mornington Peninsula, Victoria
CLIENT
South East Water (SEW)
VALUE
AU$29m
START
2014
END
2016
CAPABILITY
Water, Civil, Earthworks, Structures, Pipelines, Electrical, Pump Stations

 

 

You might also like...

Wetlands/irrigation/floodways  – Riverine Recovery Project (RRP)

Wetlands/irrigation/floodways – Riverine Recovery Project (RRP)

  • SECTOR: Water
  • LOCATION: Adelaide

The Riverine Recovery Project (RRP) forms part of the South Australian Riverland Floodplains Integrated Infrastructure Program (SARFIIP), a Commonwealth funded program to restore the health...

READ MORE
Wetlands/irrigation/floodways  – Katfish Reach Hydrological and Fish Passage Structures

Wetlands/irrigation/floodways – Katfish Reach Hydrological and Fish Passage Structures

  • SECTOR: Water
  • LOCATION: Berri, Riverland

The Katfish Reach Hydrological and Fish Passage Structures project was a significant project, part of a joint Federal and State government initiative designed to improve...

READ MORE
Water Supply –  Naracoorte Water Supply Upgrade

Water Supply – Naracoorte Water Supply Upgrade

  • SECTOR: Water
  • LOCATION: Naracoorte

This project included the design and construct of water supply network infrastructure that supplies 100% disinfected water to customers in the Naracoorte area, as part...

READ MORE
Water Supply  – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

Water Supply – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

  • SECTOR: Water
  • LOCATION: Adelaide

The Hackney Road project section involved 2.2km of pipe relining, underboring, and complete replacement of various sections of pipeline. The pipe alignment ran through the...

READ MORE
Water storage –  Werribee Aquifer Storage and Recovery Project

Water storage – Werribee Aquifer Storage and Recovery Project

  • SECTOR: Water
  • LOCATION: Adelaide

The first of its kind in Victoria, the scheme involved pumping treated water from Werribee Salt Reduction Plant through a series of underground pipe networks...

READ MORE