Maroon & Moogerah Dam Upgrade Works

This project involved the upgrade of both the Maroon and Moogerah Dams for Seqwater to improve flood security and address a number of dam safety concerns raised during dam safety reviews that had been conducted on the dams. Kery works on Maroon Dam involved the supply and installation of Lake Level Recorder Unit, including Hydrological Services HS40 level sensor unit, GC01 end unit, 300m of river line and RTU data logger, associated equipment and integration of equipment to Seqwater’s WISKI software.
While at Moogerah Dam we supplied and installed 13 grouted and post tensioned anchors (12-15.2mm strands each) to 2,100kN working load).
SHARE
LOCATION
Maroon, Queensland
CLIENT
Seqwater
VALUE
A$12.1m
START
March 2018
END
Dec 2018
CAPABILITY
Water, Construction

You might also like...

Wetlands/irrigation/floodways  – Riverine Recovery Project (RRP)

Wetlands/irrigation/floodways – Riverine Recovery Project (RRP)

  • SECTOR: Water
  • LOCATION: Adelaide

The Riverine Recovery Project (RRP) forms part of the South Australian Riverland Floodplains Integrated Infrastructure Program (SARFIIP), a Commonwealth funded program to restore the health...

READ MORE
Wetlands/irrigation/floodways  – Katfish Reach Hydrological and Fish Passage Structures

Wetlands/irrigation/floodways – Katfish Reach Hydrological and Fish Passage Structures

  • SECTOR: Water
  • LOCATION: Berri, Riverland

The Katfish Reach Hydrological and Fish Passage Structures project was a significant project, part of a joint Federal and State government initiative designed to improve...

READ MORE
Water Supply –  Naracoorte Water Supply Upgrade

Water Supply – Naracoorte Water Supply Upgrade

  • SECTOR: Water
  • LOCATION: Naracoorte

This project included the design and construct of water supply network infrastructure that supplies 100% disinfected water to customers in the Naracoorte area, as part...

READ MORE
Water Supply  – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

Water Supply – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

  • SECTOR: Water
  • LOCATION: Adelaide

The Hackney Road project section involved 2.2km of pipe relining, underboring, and complete replacement of various sections of pipeline. The pipe alignment ran through the...

READ MORE
Water storage –  Werribee Aquifer Storage and Recovery Project

Water storage – Werribee Aquifer Storage and Recovery Project

  • SECTOR: Water
  • LOCATION: Adelaide

The first of its kind in Victoria, the scheme involved pumping treated water from Werribee Salt Reduction Plant through a series of underground pipe networks...

READ MORE