Maroon & Moogerah Dam Upgrade Works

This project involved the upgrade of both the Maroon and Moogerah Dams for Seqwater to improve flood security and address a number of dam safety concerns raised during dam safety reviews that had been conducted on the dams. Kery works on Maroon Dam involved the supply and installation of Lake Level Recorder Unit, including Hydrological Services HS40 level sensor unit, GC01 end unit, 300m of river line and RTU data logger, associated equipment and integration of equipment to Seqwater’s WISKI software.
While at Moogerah Dam we supplied and installed 13 grouted and post tensioned anchors (12-15.2mm strands each) to 2,100kN working load).
SHARE
LOCATION
Maroon, Queensland
CLIENT
Seqwater
VALUE
A$12.1m
START
March 2018
END
Dec 2018
CAPABILITY
Water, Construction

You might also like...

Collaborative working – Collaborative RBP16 Frameworks

Collaborative working – Collaborative RBP16 Frameworks

  • SECTOR: Water
  • LOCATION: Adelaide

Fulton Hogan delivers a series of four-year framework agreements consisting of individual projects, bundled according to geographical location or scope. Delivery of the frameworks is...

READ MORE
Collaborative working  – Pipelines (Sewerage and Drainage) Program Alliance

Collaborative working – Pipelines (Sewerage and Drainage) Program Alliance

  • SECTOR: Water
  • LOCATION: Melbourne

The Pipelines (Sewerage and Drainage) Program Alliance was formed to design and construct new and replacement drainage and flood mitigation, sewerage transfer and drainage infrastructure...

READ MORE
Hunua 4

Hunua 4

  • SECTOR: Water, Construction
  • LOCATION: Auckland

Fulton Hogan, in a joint venture with John Holland, constructed the majority of Hunua 4, the biggest water pipeline project in New Zealand’s recent history....

READ MORE
Pukekohe Wastewater Treatment Plant Upgrade

Pukekohe Wastewater Treatment Plant Upgrade

  • SECTOR: Water, Construction
  • LOCATION: Pukekohe

Fulton Hogan carried out a $39 million upgrade to the Pukekohe Wastewater Treatment Plant to prepare for future population growth. The project involved constructing three...

READ MORE
Project Florence – Fonterra Wastewater Treatment Plant

Project Florence – Fonterra Wastewater Treatment Plant

  • SECTOR: Water, Construction
  • LOCATION: Waikato

When Fonterra was building its new milk powder plant in the Waikato, Fulton Hogan was brought in to construct a $20 million wastewater treatment plant....

READ MORE