Water storage – Olympic Dam Potable 60ML + 80ML Dams Upgrades

Fulton Hogan has undertaken the design, construction and commissioning of all works associated with the 60ML and 80ML dam upgrades including civil, electrical, sump pump, piping, liner and cover works.

Working in a remote, live mining environment has required a number of specialist processes to ensure worker safety as well as protection of significant geotechnical, environmental and cultural areas.

Scope includes:

  • Demolition and removal of existing liner, buried inlet and outlet pipework, and sumps
  • Design, supply and installation of:
    • Leak Detection & Recovery System (LDRS)
    • inlet and outwork pipework
    • inlet sump and outlet sump
    • Chlorosulfonated Polyethylene (CSPE) liner and cover
  • Remediation of dam subgrade to address degradation due to leakage or any other effects
  • Install new level transmitter, sump pump, sump pump level transmitter, chlorine analyser, flow transmitter and junction box
  • Install and terminate new field cabling and conduits, motor control gear and PLC cabling
SHARE
LOCATION Olympic Dam, South Australia CLIENT BHP VALUE AU$8m START Mar 2018 END Oct 2019 CAPABILITY Water, Civil, Earthworks, Electrical, Mechanical, Instrumentation Controls and Automation 

You might also like...

Wetlands/irrigation/floodways  – Riverine Recovery Project (RRP)

Wetlands/irrigation/floodways – Riverine Recovery Project (RRP)

  • SECTOR: Water
  • LOCATION: Adelaide

The Riverine Recovery Project (RRP) forms part of the South Australian Riverland Floodplains Integrated Infrastructure Program (SARFIIP), a Commonwealth funded program to restore the health...

READ MORE
Wetlands/irrigation/floodways  – Katfish Reach Hydrological and Fish Passage Structures

Wetlands/irrigation/floodways – Katfish Reach Hydrological and Fish Passage Structures

  • SECTOR: Water
  • LOCATION: Berri, Riverland

The Katfish Reach Hydrological and Fish Passage Structures project was a significant project, part of a joint Federal and State government initiative designed to improve...

READ MORE
Water Supply –  Naracoorte Water Supply Upgrade

Water Supply – Naracoorte Water Supply Upgrade

  • SECTOR: Water
  • LOCATION: Naracoorte

This project included the design and construct of water supply network infrastructure that supplies 100% disinfected water to customers in the Naracoorte area, as part...

READ MORE
Water Supply  – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

Water Supply – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

  • SECTOR: Water
  • LOCATION: Adelaide

The Hackney Road project section involved 2.2km of pipe relining, underboring, and complete replacement of various sections of pipeline. The pipe alignment ran through the...

READ MORE
Water storage –  Werribee Aquifer Storage and Recovery Project

Water storage – Werribee Aquifer Storage and Recovery Project

  • SECTOR: Water
  • LOCATION: Adelaide

The first of its kind in Victoria, the scheme involved pumping treated water from Werribee Salt Reduction Plant through a series of underground pipe networks...

READ MORE