Kaikōura Marina
Kaikōura Marina was almost destroyed by the 7.8 earthquake that struck the central region of New Zealand in November 2016. It was a huge setback as the harbour in South Bay is critical for the marine tourism industry, a $120 million annual earner for the region.
Fulton Hogan, which is part of the North Canterbury Transport Infrastructure Recovery (NCTIR) alliance that is repairing all the infrastructure damage, took custody of rebuilding the marina.
It faced a massive challenge as the seabed had been raised by a metre in places and the rebuild needed to be completed within a tight timeframe. The team spent a lot of time working below sea level, with 22,000 cubic metres of material needing to be dredged so that the sea channel and harbour floor could be restored to their original depth.
Piers, jetties, launching ramps, a breakwater, retaining walls and rock groyne walls were constructed. A new tender jetty was also added so that cruise ships can berth off the coast with tourists ferried into shore.
Throughout the project Fulton Hogan liaised with all stakeholders so that limited operations, such as whale watching, could continue.
All safety requirements were met on the way to delivering a quality job. Despite the scope increasing by a quarter, the marina re-opened on schedule for the summer season – to the delight of all stakeholders as well as the community.
SHAREYou might also like...
Asphalting for Spirit of Tasmania’s New Quay in Geelong
- SECTOR: Ports, Roads & Bridges, Surfacing
- LOCATION: Corio Quay, north of Geelong
Construction of Spirit of Tasmania Quay in Corio, located north of Geelong, involved extensive construction works. It included rehabilitation works along Corio Quay Road, construction...
READ MOREPrime Port Timaru Wharf
- SECTOR: Ports
- LOCATION: Christchurch
The Prime Port Timaru Wharf is approximately 330m long, and used as a multi-purpose bulk cargo, fishing and cruise vessel wharf. Prime Port has completed...
READ MOREBerth P026 Hardstand
- SECTOR: Ports, Resources, Construction
- LOCATION: Port Hedland
Sandfire Resources exports its high value copper concentrate by hauling it in containers from their DeGrussa mine site to their export terminal at Port Hedland...
READ MOREIMEX Intermodal Terminal 1
- SECTOR: Ports, Construction
- LOCATION: Sydney
Qube is developing the Moorebank Intermodal Logistics Park in Moorebank, Sydney, NSW. IMEX (Import-Export) IntermodalTerminal 1 – Construction was one of the packages of works...
READ MOREFrankton Marina
- SECTOR: Ports
- LOCATION: Queenstown
Fulton Hogan completed the land based civil works for the new Frankton Marina. Works include; sheet piling 150 metres of lake wall to a sheetpiled...
READ MORE