Kaikōura Marina

Kaikōura Marina was almost destroyed by the 7.8 earthquake that struck the central region of New Zealand in November 2016. It was a huge setback as the harbour in South Bay is critical for the marine tourism industry, a $120 million annual earner for the region.

Fulton Hogan, which is part of the North Canterbury Transport Infrastructure Recovery (NCTIR) alliance that is repairing all the infrastructure damage, took custody of rebuilding the marina.

It faced a massive challenge as the seabed had been raised by a metre in places and the rebuild needed to be completed within a tight timeframe. The team spent a lot of time working below sea level, with 22,000 cubic metres of material needing to be dredged so that the sea channel and harbour floor could be restored to their original depth.

Piers, jetties, launching ramps, a breakwater, retaining walls and rock groyne walls were constructed. A new tender jetty was also added so that cruise ships can berth off the coast with tourists ferried into shore.

Throughout the project Fulton Hogan liaised with all stakeholders so that limited operations, such as whale watching, could continue.

All safety requirements were met on the way to delivering a quality job. Despite the scope increasing by a quarter, the marina re-opened on schedule for the summer season – to the delight of all stakeholders as well as the community.

SHARE
LOCATION Kaikōura CLIENT Kaikoura District Council (NCTIR) VALUE NZ$6.6M START February 2017 END November 2017 CAPABILITY Ports, Construction

You might also like...

Berth P026 Hardstand

Berth P026 Hardstand

  • SECTOR: Ports, Resources, Construction
  • LOCATION: Port Hedland

Sandfire Resources exports its high value copper concentrate by hauling it in containers from their DeGrussa mine site to their export terminal at Port Hedland...

READ MORE
IMEX Intermodal Terminal 1

IMEX Intermodal Terminal 1

  • SECTOR: Ports, Construction
  • LOCATION: Sydney

Qube is developing the Moorebank Intermodal Logistics Park in Moorebank, Sydney, NSW. IMEX (Import-Export) IntermodalTerminal 1 – Construction was one of the packages of works...

READ MORE
Frankton Marina

Frankton Marina

  • SECTOR: Ports
  • LOCATION: Queenstown

Fulton Hogan completed the land based civil works for the new Frankton Marina. Works include; sheet piling 150 metres of lake wall to a sheetpiled...

READ MORE
New Brighton Pier

New Brighton Pier

  • SECTOR: Roads & Bridges, Construction, Ports
  • LOCATION: Christchurch

An 18 month long complex civil construction project was completed by Fulton Hogan in June 2018 with the repair and strengthening of New Brighton Pier....

READ MORE
Civil Works – Australia Pacific LNG

Civil Works – Australia Pacific LNG

  • SECTOR: Resources, Construction, Ports, Energy
  • LOCATION: Curtis Island

Fulton Hogan’s experience in earthmoving and civil construction was pivotal in meeting the challenges of the earthworks associated with a multi-billion dollar liquefied natural gas...