Collaborative working – Collaborative RBP16 Frameworks

Fulton Hogan delivers a series of four-year framework agreements consisting of individual projects, bundled according to geographical location or scope.

Delivery of the frameworks is carried out in a collaborative, open and transparent way, with issues discussed and resolved jointly between the Fulton Hogan, SA Water and plant operators.

The frameworks packages include:

  • Glenelg WWTP – resolving issues to a number of assets including the repair, rehabilitation or replacement of concrete structures and mechanical and electrical equipment
  • Switchboards & General Electrical Works – design, build and cut-over on existing WW pump station assets of 132 switchboards
  • Tank Repairs – rehabilitation and renewal of 102 tanks on major pipeline and network systems
  • Metro M&E – 50 projects requiring M&E renewal works, on water infrastructure assets

Fulton Hogan has established a long-term integrated relationship with SA Water and high performing teams to deliver significantly better value for end customers.

SHARE
LOCATION Throughout metropolitan and regional South Australia CLIENT SA Water VALUE AU $160M START 2016 END May 2020 CAPABILITY Water, Civil, Electrical, Mechanical, Instrumentation Controls and Automation  

You might also like...

Wetlands/irrigation/floodways  – Riverine Recovery Project (RRP)

Wetlands/irrigation/floodways – Riverine Recovery Project (RRP)

  • SECTOR: Water
  • LOCATION: Adelaide

The Riverine Recovery Project (RRP) forms part of the South Australian Riverland Floodplains Integrated Infrastructure Program (SARFIIP), a Commonwealth funded program to restore the health...

READ MORE
Wetlands/irrigation/floodways  – Katfish Reach Hydrological and Fish Passage Structures

Wetlands/irrigation/floodways – Katfish Reach Hydrological and Fish Passage Structures

  • SECTOR: Water
  • LOCATION: Berri, Riverland

The Katfish Reach Hydrological and Fish Passage Structures project was a significant project, part of a joint Federal and State government initiative designed to improve...

READ MORE
Water Supply –  Naracoorte Water Supply Upgrade

Water Supply – Naracoorte Water Supply Upgrade

  • SECTOR: Water
  • LOCATION: Naracoorte

This project included the design and construct of water supply network infrastructure that supplies 100% disinfected water to customers in the Naracoorte area, as part...

READ MORE
Water Supply  – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

Water Supply – Hackney Road and North East Road Trunk Water Main Upgrade (D&C)

  • SECTOR: Water
  • LOCATION: Adelaide

The Hackney Road project section involved 2.2km of pipe relining, underboring, and complete replacement of various sections of pipeline. The pipe alignment ran through the...

READ MORE
Water storage –  Werribee Aquifer Storage and Recovery Project

Water storage – Werribee Aquifer Storage and Recovery Project

  • SECTOR: Water
  • LOCATION: Adelaide

The first of its kind in Victoria, the scheme involved pumping treated water from Werribee Salt Reduction Plant through a series of underground pipe networks...

READ MORE