fbpx

Collaborative working – Collaborative RBP16 Frameworks

Fulton Hogan delivers a series of four-year framework agreements consisting of individual projects, bundled according to geographical location or scope.

Delivery of the frameworks is carried out in a collaborative, open and transparent way, with issues discussed and resolved jointly between the Fulton Hogan, SA Water and plant operators.

The frameworks packages include:

  • Glenelg WWTP – resolving issues to a number of assets including the repair, rehabilitation or replacement of concrete structures and mechanical and electrical equipment
  • Switchboards & General Electrical Works – design, build and cut-over on existing WW pump station assets of 132 switchboards
  • Tank Repairs – rehabilitation and renewal of 102 tanks on major pipeline and network systems
  • Metro M&E – 50 projects requiring M&E renewal works, on water infrastructure assets

Fulton Hogan has established a long-term integrated relationship with SA Water and high performing teams to deliver significantly better value for end customers.

SHARE
LOCATION Throughout metropolitan and regional South Australia CLIENT SA Water VALUE AU $160M START 2016 END May 2020 CAPABILITY Water, Civil, Electrical, Mechanical, Instrumentation Controls and Automation    

You might also like...

Waiari Water Treatment Plant

Waiari Water Treatment Plant

  • SECTOR: Water
  • LOCATION: Tauranga

The Waiāri Water Supply Scheme involves developing a water abstraction facility on the Waiāri Stream, a water treatment plant in No.1 Road, Te Puke, and...

READ MORE
Naseby Waste Water Filtration Beds

Naseby Waste Water Filtration Beds

  • SECTOR: Water
  • LOCATION: Central Otago

Fulton Hogan were engaged by Central Otago District Council to construct new wastewater filtration beds in the township of Naseby. The innovative design by Stantec...

READ MORE
Lyttelton Wastewater Work Package 4

Lyttelton Wastewater Work Package 4

  • SECTOR: Water
  • LOCATION: Christchurch

Installation of 4.5 kilometre of wastewater pipeline connecting to the Lyttelton Harbour’s wastewater to an existing pump station (Pump Station 15) in Woolston's Alport Place....

READ MORE
Pukekohe East Reservoir

Pukekohe East Reservoir

  • SECTOR: Water
  • LOCATION: Auckland

Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.  

READ MORE
Lyttelton Pump Stations

Lyttelton Pump Stations

  • SECTOR: Water
  • LOCATION: Christchurch

The Wastewater Lyttleton Project - Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to...

READ MORE