Dunedin City Council have been widening parts of Portobello Road since the early 2000’s. This is primarily to create space for pedestrians and cyclists with additional width and realignment for road user safety.

The project consists of 16 separable portions, (SP’s), making it the largest roading package ever contracted by the Council. As this is one of two key tourist routes the project was a priority for the Council.

In April 2018 Fulton Hogan established on site at SP8, the first section to progress. The project consisted of bulk fill, rock sea wall (hand stacked), raising the road level to future proof against sea level rise, road widening from 6.5m to 11m, drainage improvements, surfacing works, line marking, pump station upgrades, installation of kerb blocks to create a separate shared path, and landscaping. The total length of the site was 2.6 kilometres.

Summary of the works

  • Traffic management
  • Site clearance
  • 9,000m2 seawall
  • 3,500m3 cut to waste
  • 47,000m3 bulk fill
  • Stormwater improvements and modifications
  • Subsoil drainage
  • Service adjustments
  • Utilities Works including; trenches and modifications, street lighting works.
  • Pump stations – one New and three modified.
  • 30,000m2 Pavements
  • Structures including seven sets of precast stairs, a new boat shed, safety barriers and separators, landscaping, signage, roadmarking, miscellaneous structures including bus shelters, seats, a concrete boat ramp etc,

 

SHARE
Location: Dunedin Value: $12.9M Start: April 2018 End: May 2019 Client: Dunedin City Council Capability: Roading

You might also like...

Petone to Melling Cycleway

Petone to Melling Cycleway

  • SECTOR: Roads & Bridges
  • LOCATION: Wellington

The Petone to Melling Cycleway is being constructed as part of the wider Te Ara Tupua Cyleway between Wellington and the Hutt Valley heading North...

READ MORE
Sir Tim Wallis Drive rounabout

Sir Tim Wallis Drive rounabout

  • SECTOR: Roads & Bridges
  • LOCATION: Wanaka

Sir Tim Wallis Drive roundabout gives access to the Wanaka Three Parks development. Three Parks is Central Otago's newest community and commercial precinct, located just...

READ MORE
Route K Pedestrian Overbridge

Route K Pedestrian Overbridge

  • SECTOR: Roads & Bridges
  • LOCATION: Tauranga

This project involved the supply and installation of a new 72m-long steel box truss pedestrian footbridge across Route K (Takitimu Drive) in Tauranga. The bridge...

READ MORE
SH36 Pedestrian Overbridge (Matarawa Pa overbridge)

SH36 Pedestrian Overbridge (Matarawa Pa overbridge)

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Tauranga

This project involved the supply and installation of a pedestrian footbridge over State Highway 36 in Tauranga, including piers, abutments, concrete walkway, swales, a 10m...

READ MORE
Awakino Tunnel bypass

Awakino Tunnel bypass

  • SECTOR: Roads & Bridges
  • LOCATION: Taranaki

Fulton Hogan are constructing the Awakino Tunnel bypass on the SH3 between Taranaki and King Country. This project consists of 2.3km of new road to...

READ MORE