SEARCH FOR PROJECTS
Ardmore Water Treatment Plant
- SECTOR: Water
- LOCATION: Auckland
Around 70 percent of Auckland’s water goes through the Ardmore water treatment plant. For Fulton Hogan this $25 million project on behalf of Watercare Services Limited is combining almost every aspect of work relating to water you can imagine. The programme is to increase resilience at the treatment plant to meet more stringent water treatment […]
READ MOREPrime Port Timaru Wharf
- SECTOR: Ports
- LOCATION: Christchurch
The Prime Port Timaru Wharf is approximately 330m long, and used as a multi-purpose bulk cargo, fishing and cruise vessel wharf. Prime Port has completed the upgrade of 217m of the replacement of decayed timber piles and beams, the construction of a new concrete deck, and the installation of greater capacity bollards and fandering system. […]
READ MORERoute K Pedestrian Overbridge
- SECTOR: Roads & Bridges
- LOCATION: Tauranga
This project involved the supply and installation of a new 72m-long steel box truss pedestrian footbridge across Route K (Takitimu Drive) in Tauranga. The bridge connects cyclists and pedestrians as they travel between two suburbs, Bethlehem and Gate Pa. The three-span bridge is made up of a steel truss and two pre-cast concrete backspans. The […]
READ MOREAwakino Tunnel bypass
- SECTOR: Roads & Bridges
- LOCATION: Taranaki
Fulton Hogan are constructing the Awakino Tunnel bypass on the SH3 between Taranaki and King Country. This project consists of 2.3km of new road to bypass the historic one-way tunnel. The project includes two new bridges, three MSE recon block retaining walls, and approximately 200,000m3 of earthworks. The final product will include extensive riparian planting […]
READ MOREGlendowie Branch Trunk Sewer Upgrade
- SECTOR: Water
- LOCATION: Auckland
Fulton Hogan is carrying out the construction of the new 1km long x DN2100 storage tunnel. This includes a new 17m deep wastewater pumping station, six further manhole chambers along the main alignment, a new overflow structure, upgrades and connections to the live wastewater network. Additionally to this Fulton Hogan are demolishing the redundant infrastructure. […]
READ MOREHoddle Street Streamlining – Package B
- SECTOR: Roads & Bridges, Construction
- LOCATION: Melbourne
This project involves the design and construction of a ‘free flow interchange’ at Swan Street intersection on Hoddle Street and an upgrade of Brunton Avenue.
READ MORECardinia Road, Pakenham – Level Crossing Removal
- SECTOR: Roads & Bridges, Rail, Construction
- LOCATION: Melbourne
The level crossing at Cardinia Road, Pakenham was removed in December 2020, with traffic now safely travelling over the new road bridge. These works were delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). More than 23,000 vehicles travelled […]
READ MOREEvans Road, Lyndhurst – Level Crossing Removal
- SECTOR: Rail, Roads & Bridges, Construction
- LOCATION: Melbourne
The level crossing at Evans Road, Lyndhurst was removed in October 2020 and replaced with a new road bridge. These works were delivered by Metropolitan Roads Program Alliance (MRPA), made up of Alliance partners Fulton Hogan, Metro Trains Melbourne (MTM), and the Level Crossing Removal Project (LXRP). The project scope included: Constructing a shared use […]
READ MORELyttelton Pump Stations
- SECTOR: Water
- LOCATION: Christchurch
The Wastewater Lyttleton Project – Work Package #3 Pump Stations and Storage Facilities consists of the conversion of three existing wastewater treatment plants into to new pump stations as well as the construction of a new terminal pump station which is fed from the newly converted three pump stations.
READ MOREPukekohe East Reservoir
- SECTOR: Water
- LOCATION: Auckland
Construction and commissioning of a 50ML reservoir and associated works including on-site detention pond, vehicular access, associated pipes, chambers and structures, earthbunding and landscaping.
READ MORESH36 Pedestrian Overbridge (Matarawa Pa overbridge)
- SECTOR: Roads & Bridges, Construction
- LOCATION: Tauranga
This project involved the supply and installation of a pedestrian footbridge over State Highway 36 in Tauranga, including piers, abutments, concrete walkway, swales, a 10m footbridge on the east side and other associated structural works. The bridge was a 38.3m steel frame truss with GEOTUB modular 900mm columns and 1200mm dia columns using steel column […]
READ MOREWaimea Community Dam
- SECTOR: Construction
- LOCATION: Nelson
Fulton Hogan is joint venturing with Taylors Contracting on the Waimea Community Dam. A three-year project in the Lee Valley, 36km south-west of Nelson. The client, Waimea Water Ltd, is a joint venture between Tasman District Council and Waimea Irrigators Ltd. The dam is being developed after multiple droughts in the region over the past […]
READ MOREWynyard Quarter Pump Station
- SECTOR: Water, Construction
- LOCATION: Auckland
Wynyard Quarter Pump Station is a critical asset required by Watercare to manage the wastewater generated by the extensive development in the Wynyard Quarter. The primary purpose of this project was to create a deep wet-well pumping station and 24 hour storage capacity for wastewater. The pump station required a control room to house the […]
READ MORE