An 18 month long complex civil construction project was completed by Fulton Hogan in June 2018 with the repair and strengthening of New Brighton Pier.

The 300 metre pier needed all 17 of its support structures fixed following earthquake damage. With the harsh conditions of the open sea, Fulton Hogan applied innovative thinking towards site access and safety, scaffolding works and repair methodology.

The project started from the beach and worked out towards the end of the pier. Caissons, large watertight chambers, were installed around each pillar, creating a safe and dry environment for the sub-marine structural repairs.

Fulton Hogan’s work on the pier was recognised at the Canterbury Civil Contractors New Zealand (CCNZ) Awards winning the innovation and health and safety categories.

SHARE
LOCATION Christchurch CLIENT Christchurch City Council Value NZ$8.5m START January 2017 END June 2018 CAPABILITY Construction, Ports, Bridges

You might also like...

Asphalting for Spirit of Tasmania’s New Quay in Geelong

Asphalting for Spirit of Tasmania’s New Quay in Geelong

  • SECTOR: Ports, Roads & Bridges, Surfacing
  • LOCATION: Corio Quay, north of Geelong

Construction of Spirit of Tasmania Quay in Corio, located north of Geelong, involved extensive construction works. It included rehabilitation works along Corio Quay Road, construction...

READ MORE
KiwiRail Bridge 7

KiwiRail Bridge 7

  • SECTOR: Rail, Roads & Bridges
  • LOCATION: Christchurch

Replacement of a timber, twin bridge with a four span steel bridge including: • Bored piles 24m deep 1000mm in diameter • Insitu concrete head...

READ MORE
North Frame Pedestrian Bridge

North Frame Pedestrian Bridge

  • SECTOR: Roads & Bridges
  • LOCATION: Christchurch

The North Frame Pedestrian Footbridge will span 32m across the Avon River in Central Christchurch, playing a key role in the total pedestrian experience of...

READ MORE
Hallam Bypass

Hallam Bypass

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Dandenong, Victoria

VicRoads awarded FRH Projects (now Fulton Hogan) three of the six contracts on the Hallam Bypass. Two of these contracts involved the design and construction...

READ MORE
Midway Point Intersection Solution

Midway Point Intersection Solution

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Sorell

Commissioned by the Department of State Growth, the Midway Point Intersection Project is a key part of the South East Traffic Solution, which will help...