Major Cycle Routes

Fulton Hogan is one of the main contractors working to construct 13 major cycle routes across Christchurch. The cycle routes link different suburbs and provide easy access to business, residential and recreation areas. They also offer a safe transport option for cyclists, with many cycle routes separated from traffic with splitter islands.
To date Fulton Hogan has worked on the following cycle routes:

  • Papanui Parallel – a 4.9km cycleway connecting Northlands Mall and the Northern Line cycleway to the central city. During construction Fulton Hogan trialled a cycle safe truck with a 360 degree camera attached. This provided the driver with a full view around the truck at all times. Side rails were also fitted to the truck as a safety measure, meaning there was no chance cyclists could be dragged under the vehicle.
  • Sections of Rapanui-Shag Rock Cycleway, Quarryman’s Trail and Uni-Cycle cycleways.
SHARE
LOCATION Christchurch CLIENT Christchurch City Council VALUE NZ$250m (total programme value) START June 2015 END 2022 CAPABILITY Construction

You might also like...

SH36 Pedestrian Overbridge (Matarawa Pa overbridge)

SH36 Pedestrian Overbridge (Matarawa Pa overbridge)

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Tauranga

This project involved the supply and installation of a pedestrian footbridge over State Highway 36 in Tauranga, including piers, abutments, concrete walkway, swales, a 10m...

READ MORE
Waimea Community Dam

Waimea Community Dam

  • SECTOR: Construction
  • LOCATION: Nelson

Fulton Hogan is joint venturing with Taylors Contracting on the Waimea Community Dam. A three-year project in the Lee Valley, 36km south-west of Nelson. The...

READ MORE
Wynyard Quarter Pump Station

Wynyard Quarter Pump Station

  • SECTOR: Water, Construction
  • LOCATION: Auckland

Wynyard Quarter Pump Station is a critical asset required by Watercare to manage the wastewater generated by the extensive development in the Wynyard Quarter. The...

READ MORE
Riccarton Road upgrade

Riccarton Road upgrade

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Christchurch

Upgrade of a section of Riccarton Road - one of Christchurch’s busiest road corridors. This project involves the replacement of more than 3400 metres of...

READ MORE
Coastal Pathway (Shag Rock to Esplanade)

Coastal Pathway (Shag Rock to Esplanade)

  • SECTOR: Construction
  • LOCATION: Christchurch

Fulton Hogan is completing a 720 metre long shared pathway in Sumner, Christchurch, to construct new seaside access for cyclists, pedestrians and other path users....

READ MORE