Dunedin Airport – Gate 5 Extension

We are extending the existing apron to allow for increased aircraft capacity at Dunedin Airport. Part of this work includes the replacement of existing stormwater system and airfield lighting and installing a 1.2 metre wide pavement.

 

SHARE
LOCATION Dunedin, New Zealand CLIENT Dunedin International Airport Ltd (DIAL) VALUE NZ $800K START March 2019 END June 2019 CAPABILITY Airport, Construction, Sealing

You might also like...

Ray Emery Drive Reversal

Ray Emery Drive Reversal

  • SECTOR: Airports
  • LOCATION: Auckland

Fulton Hogan delivered the Ray Emery Drive Reversal and Common Service Trench (CST) project for Auckland Airport , enhancing landside infrastructure within a critical operational...

READ MORE
Laurence Stevens Drive SP1

Laurence Stevens Drive SP1

  • SECTOR: Airports
  • LOCATION: Auckland

Delivered in Auckland Airport’s busy operational landside environment, the Laurence Stevens Drive SP1 project required meticulous planning and execution to maintain 24/7 access for businesses...

READ MORE
Taxiway Zulu

Taxiway Zulu

  • SECTOR: Airports, Construction
  • LOCATION: Melbourne Airport

The Taxiway Zulu Project was first awarded in 2019 in conjunction with the Northern Access Road Project. Works will be delivered in three phases and...

READ MORE
Wellington International Airport Taxiway A Widening & Surfacing

Wellington International Airport Taxiway A Widening & Surfacing

  • SECTOR: Airports, Construction
  • LOCATION: Wellington

Recycling was an important focus during our work on the widening and resurfacing of Taxiway A at Wellington International Airport. We recycled 15 per cent...

READ MORE
Whitsunday Coast Airport Runway Upgrade

Whitsunday Coast Airport Runway Upgrade

  • SECTOR: Airports, Construction, Surfacing
  • LOCATION: Whitsunday

Whitsunday Coast Airport was the first project in Australia to achieve a zero waste status thanks to the innovative approach adopted by Fulton Hogan and...

READ MORE