Cleanaway Remediation

This project involves management of rehabilitation works at three hard waste landfill sites across Victoria containing fill such as concrete and asphalt. The works are required to achieve compliance with the Environment Protection Authority, local council and other stakeholder requirements, as well as to enable other end-use plans for certain sites. The works involve cut and fill, installation of passive gas network to capture permeating landfill gas, installation of geosynthetic material such as Geosynthetic Clay Liner (GCL) and Geocomposite Drain (GCD) and the importation of clean fill and geotechnical soil.
SHARE
LOCATION
Melbourne
CLIENT
Cleanaway
VALUE
A$61m
START
Sep 2015
END
July 2020
CAPABILITY
Construction

You might also like...

Berth P026 Hardstand

Berth P026 Hardstand

  • SECTOR: Ports, Resources, Construction
  • LOCATION: Port Hedland

Sandfire Resources exports its high value copper concentrate by hauling it in containers from their DeGrussa mine site to their export terminal at Port Hedland...

READ MORE
IMEX Intermodal Terminal 1

IMEX Intermodal Terminal 1

  • SECTOR: Ports, Construction
  • LOCATION: Sydney

Qube is developing the Moorebank Intermodal Logistics Park in Moorebank, Sydney, NSW. IMEX (Import-Export) IntermodalTerminal 1 – Construction was one of the packages of works...

READ MORE
SH36 Pedestrian Overbridge (Matarawa Pa overbridge)

SH36 Pedestrian Overbridge (Matarawa Pa overbridge)

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Tauranga

This project involved the supply and installation of a pedestrian footbridge over State Highway 36 in Tauranga, including piers, abutments, concrete walkway, swales, a 10m...

READ MORE
Waimea Community Dam

Waimea Community Dam

  • SECTOR: Construction
  • LOCATION: Nelson

Fulton Hogan is joint venturing with Taylors Contracting on the Waimea Community Dam. A three-year project in the Lee Valley, 36km south-west of Nelson. The...

READ MORE
Wynyard Quarter Pump Station

Wynyard Quarter Pump Station

  • SECTOR: Water, Construction
  • LOCATION: Auckland

Wynyard Quarter Pump Station is a critical asset required by Watercare to manage the wastewater generated by the extensive development in the Wynyard Quarter. The...

READ MORE