Cleanaway Remediation

This project involves management of rehabilitation works at three hard waste landfill sites across Victoria containing fill such as concrete and asphalt. The works are required to achieve compliance with the Environment Protection Authority, local council and other stakeholder requirements, as well as to enable other end-use plans for certain sites. The works involve cut and fill, installation of passive gas network to capture permeating landfill gas, installation of geosynthetic material such as Geosynthetic Clay Liner (GCL) and Geocomposite Drain (GCD) and the importation of clean fill and geotechnical soil.
SHARE
LOCATION
Melbourne
CLIENT
Cleanaway
VALUE
A$61m
START
Sep 2015
END
July 2020
CAPABILITY
Construction

You might also like...

SH36 Pedestrian Overbridge (Matarawa Pa overbridge)

SH36 Pedestrian Overbridge (Matarawa Pa overbridge)

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Tauranga

This project involved the supply and installation of a pedestrian footbridge over State Highway 36 in Tauranga, including piers, abutments, concrete walkway, swales, a 10m...

READ MORE
Waimea Community Dam

Waimea Community Dam

  • SECTOR: Construction
  • LOCATION: Nelson

Fulton Hogan is joint venturing with Taylors Contracting on the Waimea Community Dam. A three-year project in the Lee Valley, 36km south-west of Nelson. The...

READ MORE
Wynyard Quarter Pump Station

Wynyard Quarter Pump Station

  • SECTOR: Water, Construction
  • LOCATION: Auckland

Wynyard Quarter Pump Station is a critical asset required by Watercare to manage the wastewater generated by the extensive development in the Wynyard Quarter. The...

READ MORE
Riccarton Road upgrade

Riccarton Road upgrade

  • SECTOR: Roads & Bridges, Construction
  • LOCATION: Christchurch

Upgrade of a section of Riccarton Road - one of Christchurch’s busiest road corridors. This project involved the replacement of more than 3400 metres of...

READ MORE
Coastal Pathway (Shag Rock to Esplanade)

Coastal Pathway (Shag Rock to Esplanade)

  • SECTOR: Construction
  • LOCATION: Christchurch

Fulton Hogan is completing a 720 metre long shared pathway in Sumner, Christchurch, to construct new seaside access for cyclists, pedestrians and other path users....

READ MORE