Project Lift, Gold Coast Airport

Fulton Hogan drew on its vast experience in this sector to complete this complex project in time for the 2018 Gold Coast Commonwealth Games.

The scope involved both airside and landside works, including a large amount of vegetation clearance and bulk earthworks, before construction began on two apron bays, a link taxiway and other taxiway work including AGL infrastructure and final asphalt overlays.

Careful planning ensured full pavement reconstruction work could be finished in time for taxiways to re-open before the first flights arrived each day. Roadways, the realignment of a drainage diversion channel, and major drainage / storm water devices were also part of the project.

A robust testing and monitoring regime reduced the risk of impact on endangered flora and fauna species. Fulton Hogan led several innovations that resulted in significant cost savings for the client.

At all times safety and quality remained the priorities – making a positive impression on the client and delivering a much improved piece of infrastructure for Games visitors and other travellers using one of Australia’s busiest airports.

SHARE
LOCATION Gold Coast CLIENT Gold Coast Airport Pty Ltd VALUE A$47.6M START June 2016 END March 2018 CAPABILITY Airports Construction

You might also like...

Ray Emery Drive Reversal

Ray Emery Drive Reversal

  • SECTOR: Airports
  • LOCATION: Auckland

Fulton Hogan delivered the Ray Emery Drive Reversal and Common Service Trench (CST) project for Auckland Airport , enhancing landside infrastructure within a critical operational...

READ MORE
Laurence Stevens Drive SP1

Laurence Stevens Drive SP1

  • SECTOR: Airports
  • LOCATION: Auckland

Delivered in Auckland Airport’s busy operational landside environment, the Laurence Stevens Drive SP1 project required meticulous planning and execution to maintain 24/7 access for businesses...

READ MORE
Taxiway Zulu

Taxiway Zulu

  • SECTOR: Airports, Construction
  • LOCATION: Melbourne Airport

The Taxiway Zulu Project was first awarded in 2019 in conjunction with the Northern Access Road Project. Works will be delivered in three phases and...

READ MORE
Dunedin Airport – Gate 5 Extension

Dunedin Airport – Gate 5 Extension

  • SECTOR: Airports
  • LOCATION: Dunedin

We are extending the existing apron to allow for increased aircraft capacity at Dunedin Airport. Part of this work includes the replacement of existing stormwater...

READ MORE
Wellington International Airport Taxiway A Widening & Surfacing

Wellington International Airport Taxiway A Widening & Surfacing

  • SECTOR: Airports, Construction
  • LOCATION: Wellington

Recycling was an important focus during our work on the widening and resurfacing of Taxiway A at Wellington International Airport. We recycled 15 per cent...

READ MORE